
Pha Lai 2x300MW Thermal Power Plant No. 2
Scope of works:
- Supply of material, amendment of 6.6kV electric cables for barge unloader - D and stacker A.
- Installation and maitenance of HVAC for building system and control center.
- Maintenance of fire protection system and protection fire alarm for the factory.
|
HOA BINH ENGINEERING AND TRADING INVESTMENT JOINT STOCK COMPANY Add: Villa 15/2, Hoang Liet Str., Hoang Liet Ward, Hanoi City Tel: +84-24-3668-6390 Email: info@hbg.com.vn |
![]() |